As a planner, analyst, or system integrator, I need to know which decision a condition belongs to so that I can trace conditions back to the exact permission and avoid confusion or mis-assignment.
- Priority
- high
- Status
- proposed
- Themes
- conditions, traceability
- Actors
- planner, analyst, system-integrator
- Source
- interview
Justification
Justification just-0022
Linking each decision-condition record to both the decision-notice and the planning-condition ensures conditions are traceable to the exact permission, preventing mis-assignment and confusion.
Satisfaction: full; Confidence: medium
Satisfied by:
All of:
See complete justification record: just-0022