-
Waste management facility type
waste-management-facility-type -
Type of waste management facility
Required: True
Datatype: enum
Expected number: 1
-
Not applicable
not-applicable -
Whether the facility is not applicable
Required: False
Datatype: boolean
Expected number: 1
-
Is total capacity known
is-total-capacity-known -
Whether the total capacity is known
Required: True
Datatype: boolean
Expected number: 1
-
Total capacity
total-capacity -
Total capacity of void in cubic metres (or tonnes/litres)
Required: False
Datatype: number
Expected number: 1
-
Unit type
unit-type -
Unit for capacity/throughput (e.g. cubic metres, tonnes, litres)
Required: False
Datatype: enum
Expected number: 1
-
Is annual throughput known
is-annual-throughput-known -
Whether the annual throughput is known
Required: True
Datatype: boolean
Expected number: 1
-
Annual throughput
annual-throughput -
Maximum annual operational throughput in tonnes/litres
Required: False
Datatype: number
Expected number: 1
-
Unit type
unit-type -
Unit for capacity/throughput (e.g. cubic metres, tonnes, litres)
Required: False
Datatype: enum
Expected number: 1
Processes machinery waste
If making an 'outline' application, how waste will be managed on the development site
Fields
-
Site activity details
site-activity-details -
Description of activities, processes, and end products including site operations, plant, ventilation, and machinery
Required: True
Datatype: string
Expected number: 1
-
Proposal waste management outline variant
proposal-waste-management-outline -
Whether the proposal involves waste management development (yes/no/unknown)
Required: True
Datatype: enum
Expected number: 1
-
Waste management
waste-management-outline -
List of waste management facilities involved in the proposal. Specifically for outline applications
Required: False
Datatype: object
Expected number: 1 or more
-
Waste streams throughput
waste-streams -
Annual throughput for waste streams by waste type
Required: False
Datatype: object
Expected number: 1
-
Municipal
municipal -
Maximum throughput for municipal waste (annual throughput in tonnes/litres)
Required: False
Datatype: number
Expected number: 1
-
Construction demolition
construction-demolition -
Maximum throughput for construction and demolition waste (annual throughput in tonnes/litres)
Required: False
Datatype: number
Expected number: 1
-
Commercial industrial
commercial-industrial -
Maximum throughput for commercial and industrial waste (annual throughput in tonnes/litres)
Required: False
Datatype: number
Expected number: 1
-
Hazardous
hazardous -
Maximum throughput for hazardous waste (annual throughput in tonnes/litres)
Required: False
Datatype: number
Expected number: 1
-
Rules
- if proposal-waste-management-outline == true then waste-management-outline is required
- if proposal-waste-management-outline == true then waste-streams is required