Skip to main content

Planning permission specifications

This is a proof of concept viewer for the planning permission specifications - your feedback will help us to improve it.

module: proposed-building

Agricultural or forestry building details

Details of the proposed agricultural or forestry building, including operation type, dimensions, materials

Fields

Development operation types
development-operation-types

The types of building operation included in the agricultural or forestry proposal.

Required: True

Datatype: enum

Codelist: development-operation-type

Expected number: 1 or more

Proposed building details
proposed-building-details

Required: True

Datatype: object

Expected number: 1

Building details component

Details
details

Additional details or information about an item

Required: True

Datatype: string

Expected number: 1

Building length
building-length

Length of the proposed agricultural or forestry building in metres.

Required: True

Datatype: number

Expected number: 1

Eaves height
eaves-height

Height at the eaves of the extension, measured externally from natural ground level in metres

Required: True

Datatype: number

Expected number: 1

Building breadth
building-breadth

Breadth of the proposed agricultural or forestry building in metres

Required: True

Datatype: number

Expected number: 1

Building ridge height
building-ridge-height

Height to the ridge of the proposed agricultural or forestry building (in metres)

Required: True

Datatype: number

Expected number: 1

Wall materials
building-wall-materials

Details of the wall materials

Required: True

Datatype: string

Expected number: 1

Wall colour
building-wall-colour

Colour of the wall

Required: True

Datatype: string

Expected number: 1

Roof materials
building-roof-materials

Details of the roof materials

Required: True

Datatype: string

Expected number: 1

Roof colour
building-roof-colour

Colour of the roof

Required: True

Datatype: string

Expected number: 1

Agricultural building built within 2 years
has-agri-building-2-yrs

Whether an agricultural building has been constructed on the agricultural unit within the last two years

Required: True

Datatype: boolean

Expected number: 1

Agricultural building ground area
agri-building-area

Overall ground area of the agricultural building constructed within the last two years, in square metres

Required: False

Datatype: number

Expected number: 1

Agricultural building distance
agri-building-distance

Distance from the recent agricultural building to the proposed new building (in metres)

Required: False

Datatype: number

Expected number: 1

Houses livestock, slurry or sewage sludge
house-livestock

Whether the proposed building would be used to house livestock, slurry or sewage sludge

Required: True

Datatype: boolean

Expected number: 1

Livestock building distance from homes
livestock-building-400m

Whether livestock building more than 400 metres from the nearest house, excluding the farmhouse

Required: False

Datatype: boolean

Expected number: 1

Exceeds threhold
exceeds-threshold

Whether the ground area covered by the proposed building exceeds the relevant Part 6 threshold

Required: True

Datatype: boolean

Expected number: 1

Related work distance
related-work-distance

Whether specified related works have been erected within 90 metres of the proposed development within the last two years

Required: True

Datatype: boolean

Expected number: 1

Engineering operations threshold
engineering-operations-threshold

Whether engineering operations exceed 1,000 square metres where the agricultural unit is 5 hectares or more

Required: True

Datatype: enum

Codelist: yes-no-not-applicable

Expected number: 1

Within Scheduled Momument
within-scheduled-monument

Would the erection, extension, or alteration be carried out on land or a building that is, or is within the curtilage of, a scheduled monument

Required: True

Datatype: boolean

Expected number: 1