Building works required for change of use
Whether associated building works or other operations are required to convert the buildings to dwellinghouses under Class Q.
- Reference
cls-q-building-works-required- Name
- Building works required for change of use
- Datatype
- boolean
-
Cardinality
(Number expected)
- 1
- Entry date
- 2026-10-20
- Notes
-
Related to proposal-incl-building-operations, which records whether operations are included in a proposal. This field records whether the specified conversion works are required. The fields could potentially be combined following review of their meanings and uses; they remain distinct for now.
Are any associated building works or other operations required to make this change?
Note that such works are restricted to those listed below that are reasonably necessary to convert the building(s) for use as a dwellinghouse:
- The installation or replacement of windows, doors, roofs, or exterior walls;
- The installation or replacement of water, drainage, electricity, gas or other services;
- Partial demolition to the extent reasonably necessary to carry out the works listed above.
Answer Yes or No.
Source: section 7 of the prior approval application form for agricultural buildings to dwellinghouses (Class Q), version ECAB 2024.2.
Where this is used
Modules
This field is used in 1 module: