{
"adoption-date": "2016-05",
"authority": "1c63a33c32cd771c78dd580643c5dfb1efe2b6579f84b4a48138501c82104c9f",
"confidence": "high",
"document-url": "https://www.basingstoke.gov.uk/content/doclib/1592.pdf",
"housing-numbers": [
{
"allocated-housing": 7705,
"annual-required-housing": 850,
"broad-locations-housing": 0,
"committed-housing": 6741,
"notes": "Committed housing includes sites with planning permission (4,668), urban/brownfield opportunities (1,323), regeneration (200), and small site windfall (550). Allocated housing comes from 12 greenfield site allocations listed in Policy SS3. No broad locations identified - all housing from specific allocations.",
"organisation": "local-authority:BAN",
"organisation-name": "Basingstoke and Deane Borough Council",
"pages": "25, 27, 33, 36-37",
"required-housing": 15300,
"windfall-housing": 550
}
],
"local-plan-boundary": "E60000242",
"local-planning-authorities": [
"E60000242"
],
"name": "Basingstoke and Deane Local Plan 2011 to 2029",
"organisation": "local-authority:BAN",
"organisation-name": "Basingstoke and Deane Borough Council",
"pages_analysed": 32,
"pdf_file": "collection/document/1c63a33c32cd771c78dd580643c5dfb1efe2b6579f84b4a48138501c82104c9f.pdf",
"pdf_file_missing": false,
"period-end-date": 2029,
"period-start-date": 2011
}