{
"adoption-date": "2013-12-03",
"authority": "292ca3f71878fde71d00fb336512fc28b04fa8d8a087024f349b5890dcdad442",
"confidence": "high",
"document-url": "https://www.solihull.gov.uk/sites/default/files/migrated/Planning_LDF_Local_Plan_Final.pdf",
"housing-numbers": [
{
"allocated-housing": 3960,
"annual-required-housing": 500,
"broad-locations-housing": "",
"committed-housing": 3455,
"notes": "Plan period 2006-2028 (22 years). Housing land supply includes completions 2006-2012 (2,340), sites with planning permission (1,155), SHLAA sites (193), North Solihull Regeneration Area sites (970), allocated sites (3,960), and windfall (2,400). Total capacity 11,018 to meet target of 11,000.",
"organisation": "local-authority:SOL",
"organisation-name": "Solihull Metropolitan Borough Council",
"pages": "72-77",
"required-housing": 11000,
"windfall-housing": 2400
}
],
"local-plan-boundary": "E60000134",
"local-planning-authorities": [
"E60000134"
],
"name": "Solihull Local Plan \u2013 Shaping a Sustainable Future",
"organisation": "local-authority:SOL",
"organisation-name": "Solihull Metropolitan Borough Council",
"pages_analysed": 32,
"pdf_file": "collection/document/292ca3f71878fde71d00fb336512fc28b04fa8d8a087024f349b5890dcdad442.pdf",
"pdf_file_missing": false,
"period-end-date": 2028,
"period-start-date": 2006
}