The Cheltenham Plan
Plan details
- Organisation
-
local-authority:CHT - Organisations
- Plan period
- 2011 to 2031 (20 years)
- Source PDF
- document/Cheltenham_Plan.pdf
- Pages analysed
- 32
Housing numbers
Cheltenham Borough Council
local-authority:CHT
- Required housing
- 10,917 homes
- Allocated housing
- 923 homes
- Committed housing
- 1,540 homes
- Windfall housing
- 760 homes
- Broad locations housing
- 5,385 homes
- Pages
- 46-47, 97
- Notes
- This is a local plan for Cheltenham Borough that works alongside the Joint Core Strategy (JCS). Housing requirement comes from JCS OAN. Strategic allocations (5,385) are delivered through JCS. Plan allocations include both residential (430) and mixed-use (493) sites totaling 923.
View raw JSON data
{
"authority": "Cheltenham_Plan",
"confidence": "high",
"housing-numbers": [
{
"allocated-housing": 923,
"annual-required-housing": "",
"broad-locations-housing": 5385,
"committed-housing": 1540,
"notes": "This is a local plan for Cheltenham Borough that works alongside the Joint Core Strategy (JCS). Housing requirement comes from JCS OAN. Strategic allocations (5,385) are delivered through JCS. Plan allocations include both residential (430) and mixed-use (493) sites totaling 923.",
"organisation": "local-authority:CHT",
"organisation-name": "Cheltenham Borough Council",
"pages": "46-47, 97",
"required-housing": 10917,
"windfall-housing": 760
}
],
"name": "The Cheltenham Plan",
"organisation": "local-authority:CHT",
"organisation-name": "Cheltenham Borough Council",
"organisations": [
"E07000078"
],
"pages_analysed": 32,
"pdf_file": "document/Cheltenham_Plan.pdf",
"period-end-date": 2031,
"period-start-date": 2011
}