Local Plan 2011-2026

Plan details

Organisation
local-authority:HRY
Local plan boundary
E60000192
Local planning authorities
E60000192
Plan period
2011 to 2026 (15 years)

Housing numbers

Haringey Council

Required housing
19,802 homes
Annual required housing
1,345 homes per year
Allocated housing
20,450 homes
Windfall housing
3,593 homes
Pages
48, 51, 62-63, 173-177, 183
Notes
Strategic housing requirement is 19,802 homes (820 per annum 2011-2014, then 1,502 per annum 2015-2026). Total capacity is approximately 24,000 homes including allocations and small sites. Housing trajectory shows detailed breakdown by growth areas and site allocations.

Document

View raw JSON data
{
  "adoption-date": null,
  "authority": "b4f92a7e2b33f166c809d5100af01f2f4bb4e4555ad8a9e3bb0ff0c28dda5477",
  "confidence": "medium",
  "document-url": "https://haringey.gov.uk/sites/default/files/2024-01/final_haringey_local_plan_2017_online.pdf",
  "housing-numbers": [
    {
      "allocated-housing": 20450,
      "annual-required-housing": 1345,
      "broad-locations-housing": "",
      "committed-housing": "",
      "notes": "Strategic housing requirement is 19,802 homes (820 per annum 2011-2014, then 1,502 per annum 2015-2026). Total capacity is approximately 24,000 homes including allocations and small sites. Housing trajectory shows detailed breakdown by growth areas and site allocations.",
      "organisation": "",
      "organisation-name": "Haringey Council",
      "pages": "48, 51, 62-63, 173-177, 183",
      "required-housing": 19802,
      "windfall-housing": 3593
    }
  ],
  "local-plan-boundary": "E60000192",
  "local-planning-authorities": [
    "E60000192"
  ],
  "name": "Local Plan 2011-2026",
  "organisation": "local-authority:HRY",
  "organisation-name": "London Borough of Haringey",
  "pages_analysed": 0,
  "pdf_file": "collection/document/b4f92a7e2b33f166c809d5100af01f2f4bb4e4555ad8a9e3bb0ff0c28dda5477.pdf",
  "pdf_file_missing": false,
  "period-end-date": 2026,
  "period-start-date": 2011
}