Tewkesbury Borough Plan

Plan details

Organisation
local-authority:TEW
Local plan boundary
E60000313
Local planning authorities
E60000313
Plan period
2011 to 2031 (20 years)
Source PDF
collection/document/dc1a58a3cd63befa82e66cc71e01a5c2c7d2c8024f4c29b0d311250bc496bc02.pdf
Pages analysed
32

Housing numbers

Tewkesbury Borough Council
local-authority:TEW

Required housing
9,900 homes
Annual required housing
495 homes per year
Allocated housing
1,007 homes
Committed housing
7,461 homes
Windfall housing
414 homes
Pages
27-29, 202
Notes
JCS requirement of 9,900 homes 2011-2031. Plan allocations provide 972-1,042 dwellings (1,007 used in supply calculations). Committed housing includes 5,579 completions + 1,882 commitments. Includes 500 homes from Mitton (Wychavon). Overall shortfall of 518 dwellings to be met via JCS Review.

Document

View raw JSON data
{
  "authority": "dc1a58a3cd63befa82e66cc71e01a5c2c7d2c8024f4c29b0d311250bc496bc02",
  "confidence": "high",
  "housing-numbers": [
    {
      "allocated-housing": 1007,
      "annual-required-housing": 495,
      "broad-locations-housing": "",
      "committed-housing": 7461,
      "notes": "JCS requirement of 9,900 homes 2011-2031. Plan allocations provide 972-1,042 dwellings (1,007 used in supply calculations). Committed housing includes 5,579 completions + 1,882 commitments. Includes 500 homes from Mitton (Wychavon). Overall shortfall of 518 dwellings to be met via JCS Review.",
      "organisation": "local-authority:TEW",
      "organisation-name": "Tewkesbury Borough Council",
      "pages": "27-29, 202",
      "required-housing": 9900,
      "windfall-housing": 414
    }
  ],
  "local-plan-boundary": "E60000313",
  "local-planning-authorities": [
    "E60000313"
  ],
  "name": "Tewkesbury Borough Plan",
  "organisation": "local-authority:TEW",
  "organisation-name": "Tewkesbury Borough Council",
  "pages_analysed": 32,
  "pdf_file": "collection/document/dc1a58a3cd63befa82e66cc71e01a5c2c7d2c8024f4c29b0d311250bc496bc02.pdf",
  "pdf_file_missing": false,
  "period-end-date": 2031,
  "period-start-date": 2011
}