{
"adoption-date": "2018-07",
"authority": "debc07b151b58ee008d1175b393ddba342aaff2af2e30b83b29568b1915fa9e9",
"confidence": "high",
"document-url": "https://www2.richmond.gov.uk/docs/localplan/local_plan_interim_track_changes_for_adoption_october_2025.pdf",
"housing-numbers": [
{
"allocated-housing": "",
"annual-required-housing": 411,
"broad-locations-housing": "",
"committed-housing": "",
"notes": "Plan has total requirement of 5,928 dwellings over 2024-2039 period. London Plan sets 10-year target of 4,110 homes (2019-2029) at 411 per annum, which is rolled forward. Small sites windfall target is 234 per annum (2,340 over 10 years from 2019-2029). Stepped trajectory: 210 per annum 2021-2025, 420 per annum 2025-2028, 670 per annum 2028-2031.",
"organisation": "local-authority:RIC",
"organisation-name": "Richmond upon Thames Council",
"pages": "216-217, 241",
"required-housing": 5928,
"windfall-housing": 2340
}
],
"name": "Richmond Local Plan \u0027The best for our borough\u0027 (2024 to 2039)",
"organisation": "local-authority:RIC",
"organisation-name": "Richmond upon Thames Council",
"pages_analysed": 32,
"pdf_file": "collection/document/debc07b151b58ee008d1175b393ddba342aaff2af2e30b83b29568b1915fa9e9.pdf",
"pdf_file_missing": false,
"period-end-date": 2039,
"period-start-date": 2024
}