London Legacy Development Corporation Revised Local Plan

Plan details

Plan period
2020 to 2036 (16 years)
Adoption date
2020-04-24
Pages analysed
32

Housing numbers

London Legacy Development Corporation

Required housing
24,000 homes
Annual required housing
1,500 homes per year
Pages
14, 46
Notes
Housing target increased from 22,000 to 24,000 through main modifications. Plan anticipates 58% from existing permitted schemes, 25% from site allocations, and 17% from additional capacity/windfalls. Five-year housing land supply shows 10,934 dwellings expected 2020/21-2024/25.

Document

View raw JSON data
{
  "adoption-date": "2020-04-24",
  "authority": "f8f85cd4f1136357c9421937bf6131d62868c35ccada29655f519918f621b85a",
  "confidence": "high",
  "document-url": "https://live-qeop.pantheonsite.io/sites/default/files/attachments/Appendix%201_Inspectors%20LLDC%20Revised%20LP_Final%20Report.pdf",
  "housing-numbers": [
    {
      "allocated-housing": "",
      "annual-required-housing": 1500,
      "broad-locations-housing": "",
      "committed-housing": "",
      "notes": "Housing target increased from 22,000 to 24,000 through main modifications. Plan anticipates 58% from existing permitted schemes, 25% from site allocations, and 17% from additional capacity/windfalls. Five-year housing land supply shows 10,934 dwellings expected 2020/21-2024/25.",
      "organisation": "",
      "organisation-name": "London Legacy Development Corporation",
      "pages": "14, 46",
      "required-housing": 24000,
      "windfall-housing": ""
    }
  ],
  "name": "London Legacy Development Corporation Revised Local Plan",
  "organisation": "development-corporation:Q6670544",
  "organisation-name": "London Legacy Development Corporation",
  "pages_analysed": 32,
  "pdf_file": "collection/document/f8f85cd4f1136357c9421937bf6131d62868c35ccada29655f519918f621b85a.pdf",
  "pdf_file_missing": false,
  "period-end-date": 2036,
  "period-start-date": 2020
}