{
"adoption-date": "2020-04-24",
"authority": "f8f85cd4f1136357c9421937bf6131d62868c35ccada29655f519918f621b85a",
"confidence": "high",
"document-url": "https://live-qeop.pantheonsite.io/sites/default/files/attachments/Appendix%201_Inspectors%20LLDC%20Revised%20LP_Final%20Report.pdf",
"housing-numbers": [
{
"allocated-housing": "",
"annual-required-housing": 1500,
"broad-locations-housing": "",
"committed-housing": "",
"notes": "Housing target increased from 22,000 to 24,000 through main modifications. Plan anticipates 58% from existing permitted schemes, 25% from site allocations, and 17% from additional capacity/windfalls. Five-year housing land supply shows 10,934 dwellings expected 2020/21-2024/25.",
"organisation": "",
"organisation-name": "London Legacy Development Corporation",
"pages": "14, 46",
"required-housing": 24000,
"windfall-housing": ""
}
],
"name": "London Legacy Development Corporation Revised Local Plan",
"organisation": "development-corporation:Q6670544",
"organisation-name": "London Legacy Development Corporation",
"pages_analysed": 32,
"pdf_file": "collection/document/f8f85cd4f1136357c9421937bf6131d62868c35ccada29655f519918f621b85a.pdf",
"pdf_file_missing": false,
"period-end-date": 2036,
"period-start-date": 2020
}