Adopted Local Plan

Plan details

Organisation
local-authority:BNS
Local plan boundary
E60000064
Local planning authorities
E60000064
Plan period
2014 to 2033 (19 years)
Source PDF
document/local-plan-adopted.pdf
Pages analysed
32

Housing numbers

Barnsley Metropolitan Borough Council
local-authority:BNS

Required housing
21,546 homes
Annual required housing
1,134 homes per year
Allocated housing
14,236 homes
Committed housing
6,770 homes
Windfall housing
766 homes
Pages
Pages 57-58, 322
Notes
Total supply includes 21,006 from allocations and permissions plus 766 windfall allowance (200 villages + 566 borough-wide). Allocated housing (14,236) and committed housing (6,770) are separate components totaling 21,006. Mixed use sites contributing 4,295 dwellings are included in allocations.
View raw JSON data
{
  "authority": "local-plan-adopted",
  "confidence": "high",
  "housing-numbers": [
    {
      "allocated-housing": 14236,
      "annual-required-housing": 1134,
      "broad-locations-housing": "",
      "committed-housing": 6770,
      "notes": "Total supply includes 21,006 from allocations and permissions plus 766 windfall allowance (200 villages + 566 borough-wide). Allocated housing (14,236) and committed housing (6,770) are separate components totaling 21,006. Mixed use sites contributing 4,295 dwellings are included in allocations.",
      "organisation": "local-authority:BNS",
      "organisation-name": "Barnsley Metropolitan Borough Council",
      "pages": "Pages 57-58, 322",
      "required-housing": 21546,
      "windfall-housing": 766
    }
  ],
  "local-plan-boundary": "E60000064",
  "local-planning-authorities": [
    "E60000064"
  ],
  "name": "Adopted Local Plan",
  "organisation": "local-authority:BNS",
  "organisation-name": "Barnsley Metropolitan Borough Council",
  "pages_analysed": 32,
  "pdf_file": "document/local-plan-adopted.pdf",
  "period-end-date": 2033,
  "period-start-date": 2014
}