Skip to main content

This is a proof of concept viewer for the planning permission specifications - your feedback will help us to improve it.

module: processes-machinery-waste

Processes machinery waste

How waste will be managed on the site

Fields

Site activity details
site-activity-details

Description of activities, processes, and end products including site operations, plant, ventilation, and machinery

Required
True
Datatype
string
Expected number
1
Proposal waste management
proposal-waste-management

Whether the proposal involves any waste management facility that is relevant to the proposal

Required
True
Datatype
boolean
Expected number
1
Waste management
waste-management

List of applicable waste management facilities involved in the proposal

Required
False
Datatype
object
Expected number
1 or more

Waste management component

Waste management facility type
waste-management-facility-type

Type of waste management facility being described in this entry

Required
True
Datatype
enum
Expected number
1
Total capacity
total-capacity

Total capacity of void in cubic metres (or tonnes/litres)

Required
True
Datatype
decimal
Expected number
1
Unit type
unit-type

Unit for capacity/throughput (e.g. cubic metres, tonnes, litres)

Required
True
Datatype
enum
Expected number
1
Annual throughput
annual-throughput

Maximum annual operational throughput in tonnes/litres

Required
True
Datatype
decimal
Expected number
1
Unit type
unit-type

Unit for capacity/throughput (e.g. cubic metres, tonnes, litres)

Required
True
Datatype
enum
Expected number
1
Waste streams throughput
waste-streams

Annual throughput for waste streams by waste type

Required
False
Datatype
object
Expected number
1

Waste streams component

Municipal
municipal

Maximum throughput for municipal waste (annual throughput in tonnes/litres)

Required
False
Datatype
decimal
Expected number
1
Construction demolition
construction-demolition

Maximum throughput for construction and demolition waste (annual throughput in tonnes/litres)

Required
False
Datatype
decimal
Expected number
1
Commercial industrial
commercial-industrial

Maximum throughput for commercial and industrial waste (annual throughput in tonnes/litres)

Required
False
Datatype
decimal
Expected number
1
Hazardous
hazardous

Maximum throughput for hazardous waste (annual throughput in tonnes/litres)

Required
False
Datatype
decimal
Expected number
1

Rules

  • if proposal-waste-management == true then waste-management is required
  • if proposal-waste-management == true then waste-streams is required
  • is-total-capacity-known and is-annual-throughput-known only apply to outline applications

Where this is used

Application types

This module is used in 7 application types: