Skip to main content

This is a proof of concept viewer for the planning permission specifications - your feedback will help us to improve it.

module: proposed-building

Agricultural or forestry building details

Details of the proposed agricultural or forestry building, including operation type, dimensions, materials

Fields

Development operation types
development-operation-types

The types of building operation included in the agricultural or forestry proposal.

Required
True
Datatype
enum
Expected number
1 or more
Proposed building details
proposed-building-details
Required
True
Datatype
object
Expected number
1

Building details component

Details
details

A description of the proposed agricultural or forestry building type

Required
True
Datatype
string
Expected number
1
Building length
building-length

Length of the proposed agricultural or forestry building in metres.

Required
True
Datatype
decimal
Expected number
1
Eaves height
eaves-height

Height at the eaves of the extension, measured externally from natural ground level in metres

Required
True
Datatype
decimal
Expected number
1
Building breadth
building-breadth

Breadth of the proposed agricultural or forestry building in metres

Required
True
Datatype
decimal
Expected number
1
Building ridge height
building-ridge-height

Height to the ridge of the proposed agricultural or forestry building (in metres)

Required
True
Datatype
decimal
Expected number
1
Wall materials
building-wall-materials

Details of the wall materials

Required
True
Datatype
string
Expected number
1
Wall colour
building-wall-colour

Colour of the wall

Required
True
Datatype
string
Expected number
1
Roof materials
building-roof-materials

Details of the roof materials

Required
True
Datatype
string
Expected number
1
Roof colour
building-roof-colour

Colour of the roof

Required
True
Datatype
string
Expected number
1
Agricultural building built within 2 years
has-agri-building-2-yrs

Whether an agricultural building has been constructed on the agricultural unit within the last two years

Required
True
Datatype
boolean
Expected number
1
Agricultural building ground area
agri-building-area

Overall ground area of the agricultural building constructed within the last two years, in square metres

Required
False
Datatype
decimal
Expected number
1
Agricultural building distance
agri-building-distance

Distance from the recent agricultural building to the proposed new building (in metres)

Required
False
Datatype
decimal
Expected number
1
Houses livestock, slurry or sewage sludge
house-livestock

Whether the proposed building would be used to house livestock, slurry or sewage sludge

Required
True
Datatype
boolean
Expected number
1
Livestock building distance from homes
livestock-building-400m

Whether livestock building more than 400 metres from the nearest house, excluding the farmhouse

Required
False
Datatype
boolean
Expected number
1
Exceeds threhold
exceeds-threshold

Whether the ground area covered by the proposed building exceeds the relevant Part 6 threshold

Required
True
Datatype
boolean
Expected number
1
Related work distance
related-work-distance

Whether specified related works have been erected within 90 metres of the proposed development within the last two years

Required
True
Datatype
boolean
Expected number
1
Engineering operations threshold
engineering-operations-threshold

Whether engineering operations exceed 1,000 square metres where the agricultural unit is 5 hectares or more

Required
True
Datatype
enum
Expected number
1
Within Scheduled Momument
within-scheduled-monument

Would the erection, extension, or alteration be carried out on land or a building that is, or is within the curtilage of, a scheduled monument

Required
True
Datatype
boolean
Expected number
1

Where this is used

Application types

This module is used in 1 application type: